XRN 5605
Amendments to the must read process (IGT159V)

Last Updated
22 May 2023
Status
Current
Release Type
Unallocated
Implementation Date
TBC
Proposer Xoserve Impacted DSC service area

Service Area 4 (Current Apr 21)

Meter Read/Asset processing

Customer Change Team Leader uklink@xoserve.com

Summary

This Change Proposal has been raised to deliver the requirements set out under IGT UNC Modification 159V – Amendments to the must read process.


This Modification was raised to update the IGT must read process to include timescales for a site to enter the process and to introduce timeframes for procuring and returning a read that align with read validation.


The Change Proposal will amend the IGT must read process in line with the Modification IGT159V requirements which includes the following:


• Placing a timeframe on the must read being provided by the IGT to ensure is aligns with the current validation window.


• Allowing Shippers a mechanism to exclude SMPs from the IGT must read process which have a known meter issue preventing reads being obtained.


• Excluding SMART, AMR and DCC Active SMPs from being included in the IGT must read process.


• Where there is a SoLR or Change of Shipper event, allow a 4 month pause in the relevant SMP(s) entering the IGT must read process.


• Ensuring PAC are provided the relevant information about the IGT must read process.


Please note, Ofgem approved the implementation of IGT159V on the 02 December 2022.

Impacted Customer Types

  • Shipper
  • IGT

Documents

Document title Comment Last updated CHMC outcome
Change Proposal CP raised 13/01/2023 Approved at ChMC 11th January 2023
DSG Discussion N/A 03/04/2023 N/A
High Level Solution Options N/A 22/05/2023 N/A
Solution Review 3177 - VO - PO 22/05/2023 In consultation and approval stage 
Detailed Design Stage not yet reached 15/01/2019 N/A
Evaluation Quotation Reports (EQR) Stage not yet reached 15/01/2019 N/A
Business Evaluation Reports (BER) Stage not yet reached 15/01/2019 N/A
Change Completion Reports (CCR) Stage not yet reached 15/01/2019 N/A

Timeline

Initial Review
CP raised 22/12/22
Status CP will be presented at ChMC for approval at ChMC to proceed into Capture
Capture
Approved into capture 11/01/23
Status January ChMC approved into Capture
Solution Consultation
Solution Review Change Pack Issued 22/05/23
Status Consultation closes out on 06/06/2023
Awaiting Delivery
Expected: 00/00/00
Status Awaiting
In Delivery
Expected: 00/00/00
Status Awaiting
Implemented
Expected: 00/00/00
Status Awaiting