Image of back arrow Back to filtered results

XRN 4853
Interim process to monitor & manually load rejected reads into UK Link where the read was rejected for reason code MRE00458 only (UIG Recommendation 3.1 option 5)

Last Updated
14 Feb 2019
Status
Implemented
Release Type
Ad-hoc
Implementation Date
01 Apr 2019
Proposer Xoserve Impacted DSC service area

Service Area 5 (Previous Dec 18 – Mar 21)

Metered Volume and Metered Quantity

Customer Change Team Leader uklink@xoserve.com

Summary

CDSP to monitor rejections for rejection code MRE00458. CDSP will manually load the read to UK Link if the read has passed all other validations. Subsequent reads will load normally if they pass validation checks. This would need to be an interim process which will be required to be implemented asap and should cease once XRN4621 has been implemented (Nov 2019) if the scope change to XRN4621 to remove validation on uncorrected reads is agreed.

Impacted Customer Types

  • Shipper

Documents

Document title Last updated Type
CCR for XRN4853 04/Nov/2020 PDF
XRN4853 CP 18/Feb/2019 PDF

Timeline

Initial Review
Capture
Solution Consultation
Awaiting Delivery
In Delivery
Implemented

Contact the Change Team

Need to get in touch with a member of the Change Team?

You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.